Profile

TM Pipeline Service ApS, Company history

TM Pipeline Service is specialized in drying and cleaning of large diameters and long section oil and natural gas pipelines, piping systems and LNG tanks by using the “High volume – Low pressure” technology.

TM Pipeline Service was founded in February 2004 by Tonny Bülow and Martin Skjødt. We both have several years experience with pipeline pre-commissioning, from job sites in Saudi-Arabia, Iran, Kazakhstan, Turkey and Eastern Europe.

By using our new generation of drying units which can produce 18.000 m³ dry air pr. Hour (10.500 cfm), we are able to dry out a pipeline faster and with a significance reduction of fuel consumption compared to traditional drying equipment. This setup consists of only two 20-foot containers.​

​All our drying units are build in standard 20-foot containers, which easily can be transported by trucks, trains or by ship.
​TM Pipeline Service is also cooperating with international companies in Germany, Italy and Dubai and can in cooperation with them offer hydrostatic testing, chemical cleaning, calibration and pipeline inspection, up to 56 inch diameter.

During the year 2005, we have worked as subcontractor on large international projects, such as the Baku-Tbilisi-Ceyhan Crude Oil Pipeline Project – Lot A in Turkey and the Vestogirardi – Sulmona Natural Gas Pipeline Project in Italy.

TM Pipeline Service is rapidly growing and can already now offer several drying units with a total volume of more that 37.000 cubic meter pr. Hour (21.750 cfm).

We understand what consequence it can have if a pipeline is not proper cleaned, dried or inspected before it is taken into service. Therefore planning, reliability and effective performance of the jobsite is key words for us.​

Get in touch!

Submit the form and we will contact you.

=